Factory pull The OM-5 high temperature resistant acid resistant anti-corrosion paint Best Sell
-
Post Date:
Dec 30,2016
-
Expiry Date:
Jun 28,2017
-
Detailed Description:
Quantity: 1Metric Tons
Price:1 USD Kilograms
Payment Method: Wertern Union, Money Gram, T/T , Bitcoin
Basic Info:
Name:The OM-5 high temperature resistant acid resistant anti-corrosion paint
Apearance:Black liquid
CAS:NA
MF:
MW:
Shipment:EMS,DHL,UPS,Fedx
Package:disguised
Payment: Bank Transfer,Bitcoin,WU,MoneyGram
Products of the indicators:
1, high temperature: 250 ℃.
2, resistance to dilute acid (sulfuric acid, nitric acid, hydrochloric acid) concentration of 5%, to 80 ℃ temperature: 12 days without change;
No change 30% sulfuric acid resistant: 80 ℃ for 15 days, 30 days at room temperature without change.
3, water resistance: normal temperature for 90 days without change.
4, stripping resistance (250 ℃ heat shock/water recycling) 50 times no change.
5, anti-aging index: resistance to hot and humid test 500 h no change.
6, long service life: 13 years.
7, the construction cycle: 20 to 30 days.
Monocular turn old chimney lining desulferized renovation (new chimney lining treatment) and steel chimney inside acid-resistant anti-corrosion treatment plan:
(a), turn the old chimney lining renovation and new single-tube chimney lining treatment:
1, processing method and program: sweep clear ash (new chimney no this program), brush OM interface agent, batch OM be bored with child, brush OM - 4 base two way, brush OM - 5 type chimney after high temperature resistant acid corrosion protection coatings two (middle can increase glass cloth 1-2) the total thickness of 1.5 2.0 mm.
2, the construction cycle: 20 days (210-240 - m chimney).
(2), steel chimney inner anti-corrosive treatment plan:
1, processing methods and procedure: after cleaning brush OM - 4 base two way, brush OM - 5 type chimney high-temperature acid two anti-corrosion coating, total dry film thickness of 0.5-1.0 mm.(design institute according to the need to select the thickness)
2, the construction cycle: 20 days (210-240 m chimney)
Welcome inquiry and trying, here is Amy serving.If more details,just emails pls.
-
Company:
Zhuzhou Yuancheng Tec
[ China ]
-
Contact:
Amy
-
Tel:
86-731-22290202
-
Fax:
-
Email:
ychz2016@chembj.com
Inquiry